Energy & Renewables

Koelcapaciteit in een installatie voor de productie van plantaardige ingrediƫnten

Energy mapping of cooling capacity in plant protein production

Case story Energy mapping of cooling capacity in plant protein production An international producer of plant-based ingredients faced significant challenges at their production facility. The issues were primarily related to the utility side, where the capacity for cooling water and hot water was insufficient. To address the problem, the plant had been temporarily expanded with

Energy mapping of cooling capacity in plant protein production Lees verder Ā»

Water Hammer calculation

Water Hammer Calculations on a Three-Way Valve in a Waste-to-Heat Plant

Case story Water Hammer Calculations on a Three-Way Valve in a Waste-to-Heat Plant The project was part of the establishment of a modern waste-to-energy plant, also known as a waste-to-heat facility, where energy from waste is converted into heat. The client acted as the EPC contractor and was responsible for delivering a solution that was

Water Hammer Calculations on a Three-Way Valve in a Waste-to-Heat Plant Lees verder Ā»

Tank facility

Line Walk of Tank Facility

Case story Line Walk of Tank Facility The customer, who ensures professional storage and handling of fuel, operates a large tank facility where fuel is delivered by ship, stored in tanks, and distributed to the Danish market by trucks. The facility is well-documented and subject to strict safety requirements, as they work with flammable and

Line Walk of Tank Facility Lees verder Ā»

CFD-simulering af en buffertank

CFD simulation of flow and temperature distribution in buffer tank

Case story CFD simulation of flow and temperature distribution in buffer tank A Danish manufacturing company specializing in stainless steel components for the food industry was tasked with delivering a buffer tank for a heat pump project at a dairy plant. The buffer tank, a large vessel for hot water and a key component in

CFD simulation of flow and temperature distribution in buffer tank Lees verder Ā»

100,000 tonnes/year refinery for refining used lubricating oil

Case story 100,000 tonnes/year refinery for refining used lubricating oil Reconstruction of a new and larger refinery for Avista Oil at Kalundborg Habour, where the former refinery burned down in 2017. Avista Oil collects used lubricating oil from the entire coastal part of Western Europe and sails it to Kalundborg, from where it is refined

100,000 tonnes/year refinery for refining used lubricating oil Lees verder Ā»

Preparation and implementation of turnaround for refinery

Case story Preparation and implementation of turnaround for refinery The project involved project management of the refinery’s plant concerning re-establishment of a plant, maintenance and turnaround. Contact The process The assignments were carried out by one of Process Engineering’s project engineers who specialises in refineries and the processes and requirements that are used apply to

Preparation and implementation of turnaround for refinery Lees verder Ā»

Preparation of application for approval from the authorities of a biogas plant

Case story Preparation of application for approval from the authorities of a biogas plant Preparation of the overall material and documentation required for an application for approval from the authorities of a new biogas plant. Contact The process The project included a start-up meeting with the customer and collection of material from sub-suppliers, including: Site

Preparation of application for approval from the authorities of a biogas plant Lees verder Ā»

New steam boiler plant

Case story New steam boiler plant On the basis of material prepared by the customer, Process Engineering was responsible for complete engineering of a new steam boiler plant. Contact The process On the basis of drawings of existing buildings and a new building for the steam boiler, including all equipment, we prepared component and plant

New steam boiler plant Lees verder Ā»