Food & Biotech

Financial and schedule management for the new plant for the production of milk powder and infant formular

Financial and schedule management for the new plant for the production of milk powder and infant formular Project description One of Process Engineering’s competencies is financial and schedule management, which is an important element in project management. It ensures a visible structure, creates overview of all the activities and solves the planning tasks, and it […]

Financial and schedule management for the new plant for the production of milk powder and infant formular Lees verder »

Expansion of production of ingredients for milk powder

Expansion of production of ingredients for milk powder Project description This ’green field’ project was implemented in close partnership with the customer. The customer’s R&D supplied all basic data that were relevant to the project; they came from a laboratory and from a pilot trial. Process Engineering developed the project from pilot scale to a

Expansion of production of ingredients for milk powder Lees verder »

Client consultancy in connection with establishment of production for HMO

Client consultancy in connection with establishment of production for HMO Project description This was a project for the biotech company Glycom, which has developed an ingredient that can be added to breast milk substitutes and strengthen children’s immune system to the same degree as can traditional mother’s milk. The project included reconstructing and making ready

Client consultancy in connection with establishment of production for HMO Lees verder »

Structural project for mapping of Norwegian cheese production

Structural project for mapping of Norwegian cheese production Project description The project involved visiting and inspecting all of TINE Meierierne AS’ six factories, preparing a complete capacity analysis for each factory and devising a production diagram for each factory. The process The project mapped the production equipment at the six factories in Norway as a

Structural project for mapping of Norwegian cheese production Lees verder »

Production of ingredients for e.g. breast milk substitute

Production of ingredients for e.g. infant nutrition Project description The project involved expanding an existing process plant and a green field process plant. The existing process plant was to be expanded with raw milk silos, a pasteurisation plant for raw milk and cream plus a buffer for storage of skimmed milk and cream. The pasteurisation

Production of ingredients for e.g. breast milk substitute Lees verder »

CE marking of plant at dairy

CE marking of plant at dairy Project description CE marking of a production line for snacks, including cheese, nuts and dried fruit. The process The process involved a review of the client’s technical documentation and user manuals and a safety review of interfaces between individual machines. The action plan was prepared on the basis of

CE marking of plant at dairy Lees verder »

Local exhaust ventilation for packing lines and a central vacuum cleaning system

Local exhaust ventilation for packing lines and a central vacuum cleaning system Project description Installation of new local exhaust ventilation for two packing lines and a new and central vacuum cleaning system. The two packing lines needed to have their existing local exhaust ventilation replaced by a new one that would meet today’s requirements in

Local exhaust ventilation for packing lines and a central vacuum cleaning system Lees verder »

Purchase and commissioning of a train of carriages for internal transport

Purchase and commissioning of a train of carriages for internal transport Project description The project involved purchasing and commissioning a train of carriages for internal transport inside a factory area, where the goods and the packaging are not subjected to the weather. All electronics in the train of carriages was to be controlled wirelessly from

Purchase and commissioning of a train of carriages for internal transport Lees verder »

Replacement of an NH3 refrigeration plant with a central glycol refrigeration system

Replacement of an NH3 refrigeration plant with a central glycol refrigeration system Project description The assignment was to replace an existing NH3 refrigeration plant with a new, central glycol refrigeration system. The new system was to be put into operation while the system was still supplying production with cooling. In addition, there was a desire

Replacement of an NH3 refrigeration plant with a central glycol refrigeration system Lees verder »