Pharma

Upgrade of system for acetone cleaning

Upgrade of system for acetone cleaning Project description Upgrade of Biofac’s existing system for acetone cleaning in connection with the establishment of a new production facility for production of API Thyodea bulk. The process Biofac was responsible for the overall project management and Process Engineering reported to the project manager from Biofac. We provided consulting

Upgrade of system for acetone cleaning Lees verder »

Qualification assistance in establishment of a new production facility

Qualification assistance in establishment of a new production facility Project description Installation of new process plants and upgrade of some of Biofac’s existing process plants in connection with the establishment of a new production facility for production of API Thyodea bulk. Commissioning of new and reconstructed process plants and qualification of these plants after construction

Qualification assistance in establishment of a new production facility Lees verder »

Conceptual Design of upgrade of process water facility

Conceptual Design of upgrade of process water facility Project description Conceptual Design of upgrade of process water facility to ensure stable water quality. The process Process Engineering was responsible for Conceptual Design (CD). On the basis of a linewalk we prepared a proposal to upgrade the production and distribution of the process water facility. In

Conceptual Design of upgrade of process water facility Lees verder »

Upgrade of synthesis production in synthesis factory F2 with a new source

Upgrade of synthesis production in synthesis factory F2 with a new source Project description Project at Lundbeck A/S Lumsås where the existing process plant in synthesis factory F2 was upgraded with a new type of mixing source to supply one of the existing reactors in the synthesis hall. In connection with the upgrade the new

Upgrade of synthesis production in synthesis factory F2 with a new source Lees verder »

Conceptual Design in upgrade of talcum dosing plant for pellet production

Conceptual Design in upgrade of talcum dosing plant for pellet production Project description Project at Fertin Pharma about a Conceptual Design of an upgrade of a talcum dosing plant for pellet production in order to utilise the entire pellet extruder capacity and reduce talcum waste. The process Based on a review of the existing process

Conceptual Design in upgrade of talcum dosing plant for pellet production Lees verder »

CE marking of filtration plant

CE marking of filtration plant Project description Project at Xellia Pharmaceuticals about CE marking of a filtration plant in connection with installation of new filtration units for API cleaning. The process Xellia Pharmaceuticals was responsible for overall project management, procurement of equipment, HAZOP, mechanical installation of components and qualification of the new process equipment. Process

CE marking of filtration plant Lees verder »

Expansion of synthesis production at existing synthesis factory F2

Expansion of synthesis production at existing synthesis factory F2 Project description Project at Lundbeck A/S Lumsås where the existing process plant in synthesis factory F2 was upgraded with a new synthesis unit consisting of a reactor source, a reactor and a condenser. In connection with the upgrade the new synthesis unit had to be supplied

Expansion of synthesis production at existing synthesis factory F2 Lees verder »

New Final Handling qualification of process and supply plant

New Final Handling qualification of process and supply plant Project description Qualification (URS, IQ, OQ and PQ) of a process and supply plant at a new facility at Syntese A/S for API final handling. The facility includes a centrifuge, a vacuum dryer and a powder management plant including a supply facility (GMP and non-GMP). The

New Final Handling qualification of process and supply plant Lees verder »