Biogas for city buses in Oslo

For Wärtsilä, Norway, Victor A/S was to supply a biogas plant for the conversion of waste into liquid biogas. With the new plant, it is possible to produce enough fuel to run 135 buses. In this way, both particulate emissions and noise levels are reduced while the CO2 consumption is reduced by approx. 10.000 tonnes per year.

Process Engineering A/S worked as sub contractor for all engineering services for purification and removal of CO2 as well as liquifaction for LBG.

Biogasinstallatie bij een klant

Vaardigheden

Stuurgroep
Project management
Project/Ontwerp Ingenieur
Specialistische competenties
Tekenhulpmiddel

Project fasen

Feasibility study
Conceptual design
Basic design
Detailed design
Installation
Commissioning & handover

The process

The biogas plant is located in Nes, Romerike, close to Oslo and is designed to receive up to 50.000 tonnes of waste per year and convert it to biogas. The biogas is then converted to Liquefied BioGas (LBG) and distributed further for use in the transport industry. LBG is gas, that is condensed to a liquid form by cooling it to a temperature of approx. -160°C and compress it to approx. 40 bar.

Process Engineering participated in the project from our office in Fredericia, where 2-5 technicians and engineers contributed to the following competencies. Close collaboration and coordination between Victor and Process Engineering ensured that the project was completed as planned and with a satisfied customer.

Accepteer alstubliefts statistieken, marketing cookies om deze video te bekijken

Service and scope of the project

Heb je een project waarvoor je sterke technische vaardigheden nodig hebt?

Neem contact met ons op en ontdek hoe wij je kunnen helpen als consulting engineering partner.

Erik Kuiper
Neem contact met mij op voor meer informatie
Erik Kuiper
Country Manager the Netherlands

Book et møde