Case story

CE marking of drying cabinet system

Project at Xellia Pharmaceuticals about CE marking of an extra drying cabinet system that is installed in connection with the expansion of their API production. The drying cabinet system includes a drying cabinet, a vacuum pump, a refrigeration unit and a control cabinet.

Vaardigheden

Stuurgroep
Project management
Project/Ontwerp Ingenieur
Specialistische competenties
Tekenhulpmiddel

Project fasen

Feasibility study
Conceptual design
Basic design
Detailed design
Installation
Commissioning & handover

The process

Xellia Pharmaceuticals was responsible for project management, procurement of equipment, HAZOP, mechanical installation of components and qualification of the new process equipment. Process Engineering reportsed to the project manager from Xellia Pharmaceuticals and provided consulting services on CE marking.

In order to streamline the process, and in partnership with Xellia Pharmaceuticals, we focused on how the tests performed during the CE marking could be integrated in the qualification.

Service and scope of the project

Heb je een project waarvoor je sterke technische vaardigheden nodig hebt?

Neem contact met ons op en ontdek hoe wij je kunnen helpen als consulting engineering partner.

Erik Kuiper
Neem contact met mij op voor meer informatie
Erik Kuiper
Country Manager the Netherlands

Book et møde