Case story
CE marking of plant at dairy
CE marking of a production line for snacks, including cheese, nuts and dried fruit.
Vaardigheden
Stuurgroep
Project management
Project/Ontwerp Ingenieur
Specialistische competenties
Tekenhulpmiddel
Project fasen
Feasibility study
Conceptual design
Basic design
Detailed design
Installation
Commissioning & handover
The process
The process involved a review of the client’s technical documentation and user manuals and a safety review of interfaces between individual machines.
The action plan was prepared on the basis of the safety review. Final validation was implemented when the action plan had been completed.
Service and scope of the project
- Review of plant design
- Action plan based on safety review
- Follow-up on action plan
- Declaration of conformity
- CE labelling plate
Heb je een project waarvoor je sterke technische vaardigheden nodig hebt?
Neem contact met ons op en ontdek hoe wij je kunnen helpen als consulting engineering partner.
Neem contact met mij op voor meer informatie
Erik Kuiper
Country Manager the Netherlands
