Case story

Client consultancy in connection with establishment of production for HMO

This was a project for the biotech company Glycom, which has developed an ingredient that can be added to breast milk substitutes and strengthen children’s immune system to the same degree as can traditional mother’s milk. The project included reconstructing and making ready existing production facilities used for production of feed for ingredient production for food.

Productiefaciliteiten van Glycom

Vaardigheden

Stuurgroep
Project management
Project/Ontwerp Ingenieur
Specialistische competenties
Tekenhulpmiddel

Project fasen

Feasibility study
Conceptual design
Basic design
Detailed design
Installation
Commissioning & handover

The process

Process Engineering was the main consultant concerning process, electricity, automation and construction. The project took 18 months and was organised in phases that were planned in order to ensure adherence to the time schedule. The project was planed and implemented in close partnership with the client’s specialists within the process areas and through a form of cooperation that allowed the fastest possible decisions about the project.

The planning and the design phases were implemented at a joint project office in Fredericia where the project manager, engineers, draughtsmen and specialists from Process Engineering and the client’s specialists were able to implement all design tasks through a joint effort.

Lepel met wit poeder, als illustratie van onze rol als bouwheeradviseur bij de oprichting van HMO-productie

Service and scope of the project

Heb je een project waarvoor je sterke technische vaardigheden nodig hebt?

Neem contact met ons op en ontdek hoe wij je kunnen helpen als consulting engineering partner.

Erik Kuiper
Neem contact met mij op voor meer informatie
Erik Kuiper
Country Manager the Netherlands

Book et møde