Design of district heating system on Amager Bakke

Design of the district heating system on Amager Bakke, which is a new energy facility focused on the environment, advanced design, equipment and a waste incineration facility with production of district heating in Copenhagen.

3D-model van Amager Bakke

Vaardigheden

Stuurgroep
Project management
Project/Ontwerp Ingenieur
Specialistische competenties
Tekenhulpmiddel

Project fasen

Feasibility study
Conceptual design
Basic design
Detailed design
Installation
Commissioning & handover

The process

Process Engineering handled the design of the entire district heating facility on Amager Bakke and also acted as a sub-supplier to B&W Vølund. The facility connects the condensers from the turbine to heat exchangers and the external district heating supply, which also includes component refrigeration. The heat in the residual condensate is transferred through heat exchangers to the district heating network (the district heating facility in Copenhagen).

Illustratie van Amager Bakke

Service and scope of the project

Heb je een project waarvoor je sterke technische vaardigheden nodig hebt?

Neem contact met ons op en ontdek hoe wij je kunnen helpen als consulting engineering partner.

Erik Kuiper
Neem contact met mij op voor meer informatie
Erik Kuiper
Country Manager the Netherlands

Book et møde