An international producer of plant-based ingredients faced significant challenges at their production facility. The issues were primarily related to the utility side, where the capacity for cooling water and hot water was insufficient. To address the problem, the plant had been temporarily expanded with a mobile diesel generator in a container solution for hot water production and a mobile chiller for cooling water.

Process Engineering was hired to manage technical project leadership and develop corrective solutions.

Koelcapaciteit in een installatie voor de productie van plantaardige ingrediƫnten

Vaardigheden

Stuurgroep
Project management
Project/Ontwerp Ingenieur
Specialistische competenties
Tekenhulpmiddel

Project fasen

Feasibility study
Conceptual design
Basic design
Detailed design
Installation
Commissioning & handover

Process

The project was carried out by two engineers from our Energy & Renewables section and consisted of three steps:

We maintained ongoing dialogue with the client to obtain accurate information about the facility. At the same time, we visited the site ourselves to see how the entire plant operated.

We began with an energy mapping of the entire process to gain an overview of the energy balance in the plant for both the boiler and chiller systems. This resulted in a modification of the connection from the existing chiller system to the cooling water tank, which provided better capacity utilization and stable operation.

Koelcapaciteit in een installatie voor de productie van plantaardige ingrediƫnten

Service and scope of the project

Heb je een project waarvoor je sterke technische vaardigheden nodig hebt?

Neem contact met ons op en ontdek hoe wij je kunnen helpen als consulting engineering partner.

Erik Kuiper
Neem contact met mij op voor meer informatie
Erik Kuiper
Country Manager the Netherlands

Book et mĆøde