Case story

Establishment of Linde Gas' first Danish CO2-terminal

Linde Gas (former AGA) is Northeren Europe’s leading industrial gas company that ensures stable supplies to the Danish market. In 2018 they made an agreement with LINDØ port of ODENSE to place their first Danish CO2-terminal at Lindø’s Terminal Nord. From here they deliver CO2, which has been extracted as a by-product from other productions, directly to the customers. Process Engineering’s role in the project was to handle the entire technical part of the establishment of the CO2-terminal with preparation of pipe design, update of PID, and design and calculation of one and a half kilometer long pipe (transfer line) to transport the -40 C degrees CO2 from the wharf to the terminal.

CO2-terminal

Vaardigheden

Stuurgroep
Project management
Project/Ontwerp Ingenieur
Specialistische competenties
Tekenhulpmiddel

Project fasen

Feasibility study
Conceptual design
Basic design
Detailed design
Installation
Commissioning & handover

The process

We participated in the project with a project manager, project engineer and technical designers and had the responsibility to handle the technical part of the project. Through the entire project we had close collaboration and daily coordination with the customer and solved the project both from our own office and from site at Lindø.

We prepared the pipe design and proved the pipe dimensions according to the requested capacity and ensured that the PID (Piping and Instrument Diagram) was updated until the final layout. Also we prepared the tender material. During installation and commissioning we participated on site in cooperation with the customer’s commissioning manager and supported in the technical part such as line walk and supervision of the installation work. Moreover, we supported in SIL classification (Safety Integrity Level) by reviewing all equipment for the terminal to ensure the right safety level, and we also helped with approval at third party in regard to PED (Pressure Equipment Directive) and preparation of user manual for the plant.

CO2-terminal
CO2 terminal pipe

Especially, the pipe connection between the wharf and the terminal was a challenge to calculate. Today, CO2 is unloaded once a week, and when the pipe had to be placed underground, it had to be taken into account that the pipe contracts when -40 C degrees of CO2 flows through it. At the same time, the location of the pipe at the wharf was changed during the project, which meant that the pipe end was not long enough for the ship to connect to the terminal. Therefore, we designed custommade pipe carriages with flanges that are manually rolled out, so the pipe ends are positioned in the best way for the ship.

Accepteer alstubliefts statistieken, marketing cookies om deze video te bekijken

Service and scope of the project

Heb je een project waarvoor je sterke technische vaardigheden nodig hebt?

Neem contact met ons op en ontdek hoe wij je kunnen helpen als consulting engineering partner.

Erik Kuiper
Neem contact met mij op voor meer informatie
Erik Kuiper
Country Manager the Netherlands

Book et møde