Syntese managed the overall project management with regard to the establishment of the building, procurement of a centrifuge, a vacuum dryer, ventilation, utility water installations, heating and electric and SRO installations.
Process Engineering reported to the project manager from Syntese and provided consulting services on supply plants (GMP and non-GMP) and powder management.
The supply plants included steam, condensate, refrigeration, vacuum, water, waste water, alcohol, process water, air pressure and nitrogen. To streamline the process we focused on using commissioning tests as raw data during the qualification. All of this took place in partnership with Syntese.