Case story

New steam boiler plant

On the basis of material prepared by the customer, Process Engineering was responsible for complete engineering of a new steam boiler plant.

Stoomketelinstallatie

Vaardigheden

Stuurgroep
Project management
Project/Ontwerp Ingenieur
Specialistische competenties
Tekenhulpmiddel

Project fasen

Feasibility study
Conceptual design
Basic design
Detailed design
Installation
Commissioning & handover

The process

On the basis of drawings of existing buildings and a new building for the steam boiler, including all equipment, we prepared component and plant specifications, drawings and calculations relating to a piping system in accordance with PED, supporting constructions, a pipe bridge and placement of this, inventories and component lists plus capacity calculations of the plant.

We had a close dialogue with the customer and the customer’s sub-suppliers through the project in order to ensure that the right solution was found and to ensure that the statutory documentation was provided by the suppliers.

Installatie in stoomketelinstallatie

Service and scope of the project

Heb je een project waarvoor je sterke technische vaardigheden nodig hebt?

Neem contact met ons op en ontdek hoe wij je kunnen helpen als consulting engineering partner.

Erik Kuiper
Neem contact met mij op voor meer informatie
Erik Kuiper
Country Manager the Netherlands

Book et møde