The process technology consists of a UHT plant (Ultra High Temperature) incl. aseptic tanks and a bag-in-box filling machine.

Today the client manufactures the product as a fresh product. However, the client wished the pilot project to involve a long-life product. The process plant is to be integrated with the existing process plant and CIP.

UHT-installatie

Vaardigheden

Stuurgroep
Project management
Project/Ontwerp Ingenieur
Specialistische competenties
Tekenhulpmiddel

Project fasen

Feasibility study
Conceptual design
Basic design
Detailed design
Installation
Commissioning & handover

The process

Through the project we acted as technical consultants and analysed the client’s requirements and design data basis, and, on the basis of these, we recommended the best technology for the process plant. All specifications were gathered in a single tender material, including building footprint, standards and guidelines for the tender. In addition, we prepared a draft for the machine plan and estimated the process plant’s consumption figures.

Concurrently, the tender evaluation, including scorecard, and relating to all tenderers, was gathered in one document and reported to the client. Moreover, the client was given a CapEx with an uncertainty level of +/-20%.

Detailafbeelding van een procesinstallatie met leidingen, als voorbeeld van ons werk aan een voorontwerp van een UHT-installatie.

Service and scope of the project

Heb je een project waarvoor je sterke technische vaardigheden nodig hebt?

Neem contact met ons op en ontdek hoe wij je kunnen helpen als consulting engineering partner.

Erik Kuiper
Neem contact met mij op voor meer informatie
Erik Kuiper
Country Manager the Netherlands

Book et møde