Case story

Plant for pulverisation and separation of steel scrap

In order to meet recent legislation on reduction of waste deposit from steel scrap, Stena Metal Recycling A/S was to put into operation a plant based on completely new pulverisation principles at their facility at the Port of Grenaa before the end of 2017. The plant included several powder management and separation processes connected by approximately 40 conveyor belts, elevators, etc.

Procesinstallaties bij Stena Recycling

Vaardigheden

Stuurgroep
Project management
Project/Ontwerp Ingenieur
Specialistische competenties
Tekenhulpmiddel

Project fasen

Feasibility study
Conceptual design
Basic design
Detailed design
Installation
Commissioning & handover

The process

The project was based mainly on a number of procurements based on operational needs concerning a basic engineering package while construction and calculation of the steel structure were performed as detailed engineering by Process Engineering.

Process Engineering’s project manager and specialists mainly worked from the project office in Copenhagen. However, in connection with the preparation of the tender materials and screening of suppliers the project manager moved his office to Stena Metal Recycling’s office.

While the project was implemented, we adjusted our project organisation to include two to seven people depending on the need for various competencies.

Service and scope of the project

Heb je een project waarvoor je sterke technische vaardigheden nodig hebt?

Neem contact met ons op en ontdek hoe wij je kunnen helpen als consulting engineering partner.

Erik Kuiper
Neem contact met mij op voor meer informatie
Erik Kuiper
Country Manager the Netherlands

Book et møde