The project mapped the production equipment at the six factories in Norway as a basis for TINE’s future production planning regarding cheese.
On the basis of TINE’s possible scenarios in terms of future production of cheese we prepared the following for each factory:
- Mapping of all existing equipment, including a lifetime assessment
- Description of purchasing of required equipment and changes to buildings in relation to each individual scenario