Upgrade of system for acetone cleaning

Upgrade of Biofac’s existing system for acetone cleaning in connection with the establishment of a new production facility for production of API Thyodea bulk.

Installatie voor Acetonzuivering

Vaardigheden

Stuurgroep
Project management
Project/Ontwerp Ingenieur
Specialistische competenties
Tekenhulpmiddel

Project fasen

Feasibility study
Conceptual design
Basic design
Detailed design
Installation
Commissioning & handover

The process

Biofac was responsible for the overall project management and Process Engineering reported to the project manager from Biofac. We provided consulting services on process simulation, mechanical design and construction of the process plant.

To increase the capacity, the existing system was separated into two distillation columns in two discrete systems. We simulated the changed process and designed the new supply units (two pieces feed and two pieces condenser units) on the basis of the simulation. Units (incl. controls) were prefabricated for installation in connection with the shutdown of production during the summer holidays.

In collaboration with Biofac we focused on how the acetone regeneration system’s downtime could be reduced in connection with the reconstruction of the distillation columns and installation of the new supply units.

Voorbeeld van Document in Project met Acetonzuivering

Service and scope of the project

Heb je een project waarvoor je sterke technische vaardigheden nodig hebt?

Neem contact met ons op en ontdek hoe wij je kunnen helpen als consulting engineering partner.

Erik Kuiper
Neem contact met mij op voor meer informatie
Erik Kuiper
Country Manager the Netherlands

Book et møde